175 m² BTA
2-3 baths
3 (5)bedrooms
58m² terraces
Files and attachments
Infection rates in Costa del Sol are very low, and Palm Beach Torreblanca contruction is progressing as planned. Expected Expected completion of the entire facility is june 2021.
175 m² BTA
2-3 baths
3 (5)bedrooms
58m² terraces
See
virtual tour